Quick answer
After Backfill, spot-check the output, then decide whether to delete/archive the original; keep a backup. Backfill depends on material/compaction/drainage.
Why it matters
A backup lets you roll back if the output is wrong.
Material.
Step by step
- Check height/length/soil/water/slope/base.
- Separate material/base/drainage/backfill/engineering.
- Tall walls/steep slopes need engineer/permits.
- Get 2-3 quotes; confirm scope/drainage/warranty.
Common mistakes
- Wall price only, not drainage/base.
- Ignoring soil/water/slope.
- No engineer/permits for tall walls.
- No drainage/warranty terms.
Checklist
- Height/length/soil/water/slope.
- Material/base/drainage/backfill.
- Engineer/permits/safety.
- Warranty/payment/contract.
- Budget/maintenance/monitoring.
Key facts
- Material.
- Compaction.
- Drainage.
FAQ
What should I do after Backfill?
After Backfill, spot-check the output, then decide whether to delete/archive the original; keep a backup. Backfill depends on material/compaction/drainage.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: NCMA