Home/Answers/Gravity
RETAINING WALL COST LAB / Gravity

After Gravity Processing

After Gravity, spot-check the output, then decide whether to delete/archive the original; keep a backup.

Updated 2026-11-01About 3 minLocal test
Quick answer

After Gravity, spot-check the output, then decide whether to delete/archive the original; keep a backup. Gravity wall depends on height/width/base/soil.

Why it matters

A backup lets you roll back if the output is wrong.

Height.

Step by step

  1. Check height/length/soil/water/slope/base.
  2. Separate material/base/drainage/backfill/engineering.
  3. Tall walls/steep slopes need engineer/permits.
  4. Get 2-3 quotes; confirm scope/drainage/warranty.

Common mistakes

  • Wall price only, not drainage/base.
  • Ignoring soil/water/slope.
  • No engineer/permits for tall walls.
  • No drainage/warranty terms.

Checklist

  • Height/length/soil/water/slope.
  • Material/base/drainage/backfill.
  • Engineer/permits/safety.
  • Warranty/payment/contract.
  • Budget/maintenance/monitoring.

Key facts

  • Height.
  • Width.
  • Base.

FAQ

What should I do after Gravity?

After Gravity, spot-check the output, then decide whether to delete/archive the original; keep a backup. Gravity wall depends on height/width/base/soil.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: NCMA