Quick answer
To set up Checklist, confirm the input format/device, choose output settings, then run a small batch. Checklist covers height/drainage/engineering/warranty.
Why it matters
Validate on a small sample before running the whole batch.
Height.
Step by step
- Check height/length/soil/water/slope/base.
- Separate material/base/drainage/backfill/engineering.
- Tall walls/steep slopes need engineer/permits.
- Get 2-3 quotes; confirm scope/drainage/warranty.
Common mistakes
- Wall price only, not drainage/base.
- Ignoring soil/water/slope.
- No engineer/permits for tall walls.
- No drainage/warranty terms.
Checklist
- Height/length/soil/water/slope.
- Material/base/drainage/backfill.
- Engineer/permits/safety.
- Warranty/payment/contract.
- Budget/maintenance/monitoring.
Key facts
- Height.
- Drainage.
- Engineering.
FAQ
How do I set up Checklist?
To set up Checklist, confirm the input format/device, choose output settings, then run a small batch. Checklist covers height/drainage/engineering/warranty.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: FEMA