Home/Answers/Cost factors
RETAINING WALL COST LAB / Cost factors

Cost factors Failed? Troubleshooting

When Cost factors fails, troubleshoot in order: file/format, permission/lock, output settings, another tool.

Updated 2026-11-01About 3 minLocal test
Quick answer

When Cost factors fails, troubleshoot in order: file/format, permission/lock, output settings, another tool. Height/length/material/drainage/engineering drive total.

Why it matters

Start with the most common and cheapest causes to narrow it down fast.

Height.

Step by step

  1. Check height/length/soil/water/slope/base.
  2. Separate material/base/drainage/backfill/engineering.
  3. Tall walls/steep slopes need engineer/permits.
  4. Get 2-3 quotes; confirm scope/drainage/warranty.

Common mistakes

  • Wall price only, not drainage/base.
  • Ignoring soil/water/slope.
  • No engineer/permits for tall walls.
  • No drainage/warranty terms.

Checklist

  • Height/length/soil/water/slope.
  • Material/base/drainage/backfill.
  • Engineer/permits/safety.
  • Warranty/payment/contract.
  • Budget/maintenance/monitoring.

Key facts

  • Height.
  • Material.
  • Drainage.

FAQ

How do I troubleshoot a failed Cost factors task?

When Cost factors fails, troubleshoot in order: file/format, permission/lock, output settings, another tool. Height/length/material/drainage/engineering drive total.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: FEMA